Just had my project ev charger fitted today the reasons I went for this one is that it’s got good app support no earth rod required it has load levelling plus a 5 year warranty they done a great clean job all wiring is outside including it’s own consumer unit thanks Armstrong renewables from Washington
 

Attachments

  • 6AEE3580-C2C1-4D87-BC22-8D71D820CE6A.jpeg
    6AEE3580-C2C1-4D87-BC22-8D71D820CE6A.jpeg
    412.3 KB · Views: 142
  • 90D9D73A-DDA7-4248-92C2-7739586E522A.jpeg
    90D9D73A-DDA7-4248-92C2-7739586E522A.jpeg
    670.1 KB · Views: 147
  • 31844D8D-AA63-43EB-9200-3413C1BE0179.jpeg
    31844D8D-AA63-43EB-9200-3413C1BE0179.jpeg
    408.5 KB · Views: 156
  • E8E0757E-9E8D-4755-9317-8833B636AFE7.jpeg
    E8E0757E-9E8D-4755-9317-8833B636AFE7.jpeg
    366.3 KB · Views: 152
Very nice Sir! :cool: Please let us know how you fare with this - I have a Pod Point installed but am looking to move house in the next couple of years so will have to decide whether to take the Pod Point with me, or get another charger installed in my new house.

Cheers

Bloggsy
 
Just had my project ev charger fitted today the reasons I went for this one is that it’s got good app support no earth rod required it has load levelling plus a 5 year warranty they done a great clean job all wiring is outside including it’s own consumer unit thanks Armstrong renewables from Washington
How much £££ ?
 
Ev chargers UK are installing one called EVCP sync on their website for £615. It seems seems do everything such as schedules, WiFi, solar etc. Just hope it all works
That also incudes a one way board also as my current board hasn't got the space
 
Dose that one need a eating rod that was a big concern when choosing a charger
They asked for a picture of the earthing wire that's connected to my gas pipe I think, they aren't installing any additional earth rod so I assume its OK. Mine is a newbuild though so possibly ealready has enough earthing? Only think think said is I didn't have capacity on my board so need to install the additional board.
 
They asked for a picture of the earthing wire that's connected to my gas pipe I think, they aren't installing any additional earth rod so I assume its OK. Mine is a newbuild though so possibly ealready has enough earthing? Only think think said is I didn't have capacity on my board so need to install the additional board.
I also did not want any internal wiring the electrician ask to see the earth wires on my water and gas pipes and replace some bonding clamps
 