dsr
Established Member
I have an ER, but assume my query relates to LRs as well.
A charge failure last night led me to think how awkward that would be if I wanted a 100% battery for a long trip the following day. Would I be damaging the battery if I charged to 100% the night before = 24-30 hours before setting off on a long trip?
I appreciate I could play safe by charging to 80% in advance and topping up on the final night, knowing that a failure then would still leave me with a full-ish battery.
A charge failure last night led me to think how awkward that would be if I wanted a 100% battery for a long trip the following day. Would I be damaging the battery if I charged to 100% the night before = 24-30 hours before setting off on a long trip?
I appreciate I could play safe by charging to 80% in advance and topping up on the final night, knowing that a failure then would still leave me with a full-ish battery.