The initial shipment via Southampton Docks looks to have been fully unloaded, as the MV Titus is now showing as underway. i.e. it has left the docks.
Now comes the massive logistical challenge of any MG PDI, then loads of car carriers collecting these and delivering them out to dealerships with their allocations in correct spec and colour.
Of course, this will be run like a well-oiled machine as this is standard stuff for the car industry, docks, and transporters.
Should mean a decent chance of customer test drives for the middle of September, as some dealerships have been advising.