Lambiek V
Novice Member
- Joined
- Oct 21, 2020
- Messages
- 9
- Reaction score
- 0
- Points
- 4
- Location (town/city + country)
- Netherlands
- Driving
- ZS EV
I bought a smart charge station from Zonneplan for my MG ZS EV 2020.
The station should give me the ability to start a scheduled load session let’s say after two hours.
So I scheduled, connected the cable and closed the doors.
After waiting two hours unfortunately nothing happened at the scheduled start time.
Has anyone the same kind of issues and/or the solution ?
Thanks, Lambert.
The station should give me the ability to start a scheduled load session let’s say after two hours.
So I scheduled, connected the cable and closed the doors.
After waiting two hours unfortunately nothing happened at the scheduled start time.
Has anyone the same kind of issues and/or the solution ?
Thanks, Lambert.
Last edited by a moderator: