Chick
Novice Member
- Joined
- Nov 20, 2023
- Messages
- 5
- Reaction score
- 1
- Points
- 1
- Location
- Cumbrae, Scotland
- Driving
- MG4 Trophy LR
We got our MG4 Trophy Long Range 3 days ago and charged it at a public charging station which is 22kW 3-phase.
I didn't realise that the cable supplied by MG is 32A single phase and not 3-phase so not able to get full 11kW of charge available. Ours was the only car connected to the 2 port station but we only pulled 2.7kW over a 8 hour period and didn't get to the 80% we were looking for.
When i checked the infotainment screen it had an 8A,16A and AC charge option but no 32A option, just wondering if there is something we are missing and think the charge station is functioning as it should.
Ant advise welcome.
I didn't realise that the cable supplied by MG is 32A single phase and not 3-phase so not able to get full 11kW of charge available. Ours was the only car connected to the 2 port station but we only pulled 2.7kW over a 8 hour period and didn't get to the 80% we were looking for.
When i checked the infotainment screen it had an 8A,16A and AC charge option but no 32A option, just wondering if there is something we are missing and think the charge station is functioning as it should.
Ant advise welcome.
Last edited by a moderator: