- Joined
- Sep 23, 2021
- Messages
- 42
- Reaction score
- 91
- Points
- 27
- Location
- East Kilbride, Scotland
- Driving
- MGS5
Yeah, I know, were billed on their own website as 150kW, but have been told that they could do up to 300kWI love the "Max 150kW" sign below the screen ;-) Time to find a 400kW charger and arrive with 5% battery, pre-heated, to see what you can get!
 , pleasant surprise of under promising and over delivering.
, pleasant surprise of under promising and over delivering.Presumably the ~150kW limit is for 400V vehicles, and 300kW for 800V vehicles. It's a lot easier to make a cable that rated at 800V than one rated for over 375A.were billed on their own website as 150kW, but have been told that they could do up to 300kW