Tonych
Established Member
Anyone able to advise if i've got unrealistic speed expectations on public, AC, 11kw charging on my MG4 Long Range? I was super impressed at rapid charging rates above 100 kw. But when I plug into our local SMOOV 11kw charger I am getting only 3.5kw and it takes sooooo long to charge. I realise MGs cant charge faster than 7Kw, but it's surprised MGme that it's so low. Am I doing something wrong?