Ayoull
Prominent Member
May need but may not get, as it's determined in the UK under the Distribution code and ENA G88, companies such as MFG operate their own charger network and petrol stations under the DCODE and G88 a company and it's subsidiaries can only have one connection on a site, in order to prevent the risk to life or property that may occur through multiple points of intake due to possible interconnectivity.need their own electric services anyway.
Historically this hasn't been enforced but it's ended up causing some interesting issues on a few sites where the customer has interconnected numerous DNO supplies which is on contravention of the DNOs legal obligations as set out in the electricity act and esqcr. [Electricity Safety, Quality and Continuity Regulations]
Last edited by a moderator: