Similar situation here too when picking which MG4 to go for.
go for a Trophy on its own....
or an SE SR and £7k spare from our available funds for some sort of Energy system.
So we decided to go for the SE SR and a Home Battery Solution.
We're looking at just going battery only with no Solar as we have East/West Roof alignment , so not optimum for the extra cost.
We're going for 10kW battery storage and an AC coupler to load up the battery when its on the cheap Octopus Go tariff, then use the charge for peak to save money.
currently still paying 5p kW until May next year and 13.9p Peak.
So Next May was going to be a real rude awakening for us.
I know Go will increase next year when ours runs out, but still going to be hell of a lot cheaper than without the Storage.
Also there is talk of being rewarded for only using off peak electricity with reductions to your bills etc.
Which this will help with.
Just need to find someone to fit it all now before the installation costs skyrocket too with demand.
Currently looking at £5995 for GivEnergy system with 9.5kw battery installed including VAT too.
But they cant fit it until April next year.
Have another one that's quoted who are a little more expensive (£1000 ish) but can fit in next 2-3 weeks.
Just waiting to hear back, then we'll get cracking.
Only downside with Battery only is you have to pay the VAT
If bought with Solar panels you don't.
Bloody Government !!
Still a good saving over the crazy costs coming though.
with regard to only pulling 2.4 kw from the car, the AC couplers for home storage only start at 3kw and go up in value and price from there on, so not a million miles away with V2L.
I just don't want to put a charge/drain cycle on my car battery every day to try save money and end up reducing the cars range quickly.
It will be interesting to see if the car logs charges and discharges anywhere in the system.
If MG are offering 7 Years on the battery based on charge cycles probably, but its being hammered for V2L every day too.
I'm sure they'll be able to tell somewhere and probably reduce the battery cover with it.
Hi Jester27 I agree with what you have written, my advice would be get the battery ASAP forget about the extra cost to get it in 2/3 weeks, if you wait until April 6 months or more, then things might change are there might be none to be had so get it while you can, a grand extra is a lot I know but you could perhaps get a lot of that back as you will have have been using it and saving money over them six months waiting until April.
As for solar East-West facing no it’s not ideal but it works fine, you might lose 10 % if that over a south set up my own array is almost fully south facing and in the summer months may not give out very much before about 9/10 AM, so I have been trying to find someone to fit panels on my east gable wall as that is in full sun from sunrise 05:30 ish, until mid afternoon most days, in fact around as much sunlight as the south facing roof array.
My sons home as a hip type roof and as 8 panels facing east and 8 facing south his output from both is almost identical over each day so I would go with it as long as you have no shading.
On YouTube there are many videos that show the way east-west perform, Daniel Coe, and EV puzzle, Nigel I think his name is, have a look at them to start.
Not to worried about the car battery it’s designed to to use on V2L won’t be doing that everyday and as long as you don’t go beyond its limits should not be an issue, one thing I have done is order the official MG adaptor for V2L May be a little more expensive than others on the market but if there became a problem, MG could not say that this cheap Chinese adapter was the cause of it, and I have read the warranty and nothing in there gives any limitation on use of the set up.
Les
Edit sorry Jester27 I got you name wrong earlier at the beginning of this now edited was only just waking up
Les