I believe it is like for like, although I have never tested 11kW AC charging to check. There was no change made to the charge port itself, the pins are all still there, but it is possible that it is limited to 7kW.I guess that has been MG's frame of mind all along, never admit anything is wrong and never admit it has happened before. At least they didn't brand it as a characteristic.
Those who have had the CCU replaced did they replace it with the same unit as originally fitted i.e. 11 kW 3 phase unit or the 7 kW single phase unit fitted to the later cars?
I must admit I can't really see the need for anything beyond 7kW with AC charging, or it is too quick overnight or during the working day!